Feed / Dynamics
mediumDynamicsProject Operationsga releasem365_message_center · Jul 13, 2026
Dynamics 365 Project Operations - Configure Maximum Daily Time Entry Duration
Dynamics 365 Project Operations will introduce a new feature allowing admins to configure maximum daily time entry duration, enhancing control over time tracking. This general availability release on July 24, 2026, provides better governance and accuracy in project time logging.
“Services: Dynamics 365 Apps. We are announcing the ability to configure maximum daily time entry duration in Dynamics 365 Project Operations. This feature will reach general availability on July 24, 2026.<br><br> <b>How does this affect me?</b><br> With this feature, admins can configure the maximum time that can be …”
View original article →Audience
admin
Environment
cloud
Classification confidence: 95%
Loading correlations…